Jeddah Tower is one of the most ambitious urban developments in the Kingdom, aiming to exceed 1,000 meters in height to become the world's tallest building upon completion. It is located within Jeddah Economic City in northern Jeddah, a mixed-use development destination rather than just a standalone tower.
Location, Developer, and Design
The project is located in Jeddah Economic City in northern Jeddah, close to the Red Sea coast. Jeddah Economic Company is associated with the project, while the architectural design is by Adrian Smith + Gordon Gill Architecture. The tower is considered the focal point of the city's first phase.
Jeddah Economic City
According to Kingdom Holding Company's announcement, the total area of Jeddah Economic City is approximately 5.3 million square meters, while Phase 1 covers approximately 1.3 million square meters. This means evaluating the area must include roads, utilities, and surrounding developments, not just the building's height.
What Are the Expected Uses Inside the Tower?
Official and architectural design materials describe the project as a mixed-use building featuring hospitality, residential, office, and observation deck components. Since mega-projects may undergo design and operational updates during execution, it is best to use phrasing such as "according to announced plans" and avoid stating precise operational details before they are released by the developer.
Engineering Challenges
A building of this height requires specialized engineering solutions for wind resistance, foundations, elevators, mechanical systems, and safety. The design features a tapered, three-petal footprint that helps mitigate wind loads. Exact specifications regarding foundations, elevators, and speeds should only be published when sourced directly from an updated engineering source.
How Should Property Seekers Evaluate Surrounding Areas?
Actual Location, Not Just District Name
Measure travel times to the project, major thoroughfares, the airport, and services, and assess the property's specific street-level positioning and access.
Infrastructure Status
Review existing and planned roads, construction progress, and the availability of water, electricity, sewage, and utility networks. Do not assume all city components are complete simply because part of the tower progresses.
Property Type and Demand
Evaluating land differs from evaluating an apartment, villa, or commercial building. Permanent residential demand also differs from demand driven by office spaces or hospitality.
Supply Volume
Mega-projects may boost overall appeal, but they can also add substantial new supply. Monitor upcoming inventory, land subdivisions, and actual transaction prices rather than relying solely on asking prices in listings.
Does the Project Raise Prices Across All North Jeddah Districts?
There is no automatic outcome. Progress on the project may heighten interest in northern Jeddah, but its impact varies based on distance, accessibility, infrastructure, property type and quality, available supply, and purchase timing. Distributing claims that districts like Obhur Al Shamaliya, Al Zumurrud, or others are guaranteed beneficiaries solely due to the project's name is inaccurate.
Pre-Decision Checklist
- Review the latest official statement regarding construction status.
- Verify the site location, subdivision plan, and available utilities.
- Visit the area at different times of day.
- Compare against properties of similar age, size, and use.
- Factor in potential project delays or schedule adjustments.
- Review licenses and documentation prior to making any funds transfer.
Also Use Jeddah Location Comparison Guide To evaluate properties objectively without being influenced by marketing hype.
Project History in Brief
Construction began on the tower before works were paused. In October 2024, an agreement to resume construction was announced. This timeline is crucial when evaluating news: distinguish between original design specs, construction status at the time of the pause, the completion contract, and subsequent official updates.
Why Are Conflicting Figures Circulating?
Various websites report differing figures for floor counts, height, elevators, and completion dates, often confusing constructed floors with planned floors, or the tower with the master city. The solution is to state figures alongside their source and date, avoiding terms like "currently" without direct, updated confirmation.
Frequently Asked Questions
Is the tower completed?
No. It is an ongoing development aiming to be the world's tallest building upon completion.
Has a guaranteed final completion date been announced?
Estimated schedules exist, but real estate decisions should not rely on completion dates that are not contractually binding to the buyer.
Is buying land nearby better than buying an apartment?
This cannot be generalized. Land requires evaluating intended use, infrastructure, and liquidity, while an apartment requires assessing building quality, management, and rental demand.
Official Sources and Review
Last Information Review: August 1, 2026
Make Your Decision Based on Clear Information
Browse available properties or submit your real estate request to be contacted.


Comments